Starting at one corner of the roof wedge a pry bar into the narrow space at the top of the shingle mold the thin wooden strip that sits just below the shingles.
Roof rake at eave.
Hold onto the old shingle mold if it looks to be in good shape.
Its unique lightweight design will help you remove leaves pine needles and other debris from your roof while standing safely on the ground.
Pro start eave rake starter strip is a key part of the gaf smart choice roof system solution.
The drip edge should be nailed centered in the top surface every 8 to 10 inches.
The rake can be smooth without the overhang or it can lift the gable end like an eave.
At the eaves the drip edge should be installed before the eave protection membrane.
The rake of a roof is the outer edge that runs from the eave to the ridge or peak of the roof.
Reviews 88 the leaf roof rake is not just another tool.
It is typically perpendicular to the eave.
Before the roof sheathing goes on the open framing provides easy access for attaching the return blocking and the nailers for the rake soffit.
Using a pre cut eave rake starter strip will provide a cost effective alternative to using cut up shingles as your starter course.
It is a term that describes the slanted sides of a gable end.
The above figure shows the correct application of the drip edge.
Force the mold away from the roofing a few inches at a time then lift off the entire piece in one section.
The hanging rake then locks with the soffit and fascia or opens to the left.
Includes a high quality properly positioned adhesive that will tightly lock your shingles in place to help prevent blow off.
At the rake the drip edge is installed over the underlay.
The purpose of the eave is to keep rainwater away from the walls of the house.
A roof rake can be intricately designed.
Use larger rake boards such as 1 by 4 inch and 1 by 6 inch when there isn t an eave overhang on the gable end.
One by 2 inch rake boards often cover the exposed top edge of the siding when there also is an eave overhang on the gable end.
The last pieces to go in were nailing blocks above the ledger for the back of the return and at the bottom edge of the soffit for attaching the rake 20.