The metal i m using is called crinkle black i purchased all my materials at h.
Roof flange installation.
Install the roofing screws vertically along each rib in the panel.
For pricing and availability.
Kozy kollar manufacturing inc 1 industrial park drive unit 21 pelham nh 03076 tel.
Be sure the flange is seated squarely on the roof.
Adhere the joint where the cut edges of the shingles meet the dome.
Step flashings are to be installed one per course.
The roof deck flange of step flashings are to be fastened to the surface of each shingle in a position whereby the next course of shingles will cover up hide the flashing from view.
Nail the lower corners with roofing nails and tar the heads.
L shaped flashing is a versatile general use flashing used where a uniform or strengthened finish is needed on a 90 surface.
Align the first metal roofing panel so that it overlaps the edging by 1 2 to 3 4 of an inch and is square to the roof.
Adhere the shingles adjacent to the flange with roofing tar.
Oatey 1 1 2 in to 3 in x 15 in plastic vent and pipe flashing.
The gibraltar building products l flashing protects your home the gibraltar building products l flashing protects your home from moisture infiltration where your wall meets your roof.
Apply a bead of asphalt roof cement on the bottom of the vent.
Placement of flange over vent pipe.
Cut the shingles to fit around the flange s dome.
Be sure the larger edge is laid so that the small edge of the next panel will overlap it.
Choosing a whole house fan.
Slide the vent under the shingles so they cover the top half of the vent flange.
In this video i cover installing a roof boot for a vent pipe in a metal roof.
Oatey retro master roof flashing 1 4 in to 4 in x 8 in epdm rubber vent and pipe flashing.
To install the vent the roofer slips the flange the metal lip of the vent under shingles at the upper part of the hole and rests the flange on top of the shingles at the down slope part of the hole.
Lay the lower edge of the flange over the top of the lower shingles and the upper edge is positioned underneath the.
Place the first screw.
The lower half of the flange sits on top of the shingles.