L s 202 roof edge termination 2 gutter.
Roof edge termination.
The edge termination procedure is the same as above.
Position membrane to extend over roof edge and down vertical substrate to 1 below roof deck or nailer.
Soprema counter flashing is designed to provide a watertight termination at the leading edge of the roofing material.
The extruded aluminum resists rust and has eight bearing points to hold rubber in place.
Allow to flash off.
File name size date.
L s 221 mid parapet termination 1 reglet.
Roof edge termination of ballasted or mechanically attached roofing membrane systems.
The 12 inch gravel stop sections were cut at random which allowed the tests.
K formed aluminum gravel stop was attached to a pressure treated s p f roof edge mock up utilizing a 0 042 thick reinforced tpo roofing membrane.
L s 203 roof edge termination 3 gravel stop or drainage bar.
Apply a 3 8 wide bead of waterstop 1 2 below roof deck or nailer.
A 12 inch wide section of 0 062 thic.
L s 201 roof edge termination 1 edge system.
Form a 1 2 minimum radius apply termination tape remove the release paper from the tape fold the rubber over the edge press the rubber firmly into the tape apply caulk to the back of a drip edge termination bar and screw the termination bars through the rubber and tape and into the spacer block.
L s 211 parapet termination 1 cap flashing.
L s 212 parapet termination 2 coping stone.